The benefits of using Presto Engineering's Dual Test Platform approach include:
- Faster (and cheaper) availability of the first validation test solution after tape-out;
- More efficient validation (and error correction) process;
- Quicker development of the production vectors;
- Much more cost-effective validation and characterization phases.
Two test platforms carry some investment: an additional loadboard,
more exhaustive use of BIST (and consequently its port to the production platform).
The simulation below provides a typical estimate of the saving, net of additional
cost driven by the second test platform, that this approach will generate.
This short survey collects the basic data required to run our internal model.
It follows the typical PrestoPE flow of validation, characterization then production, estimating
at each step the factors most relevant to an overall cost estimate.
Please position the cursor on the first input box below, and tab through each answers
before clicking "Run Simulation" at the bottom.